Master plan designed by * Kuwaiti Atik Company *
Engineering consultant and general supervision * Engineer Hussein Sabbour *
– The compound is located on the largest of the two main axes, the link between the R7 area with R8 and R10.
– Located on the third largest main square after the cathedral and the British University.
– Directly in front of the largest mall in the Middle East (Mega Mall).
– The only compound on two axes of 95 meters and two main streets of 45 meters, The company has the right to develop the square and name it.
– The compound 30 acres-total: 38 buildings
– The construction rate is 20%.
– 80% services
Services :
– 21 artificial lakes
– 4 pools
– Track for walking
– Gym and spa
– Service mall for the compound
– Third floor apartment, swimming pool view and landscape
– Area: 222 M²
Payment system:
– 15% down payment, installments over 5 years
– Finishing is optional with fees
For more details:
Ghoneim : 00201200202804
Or visit our website www.districteg.com
Compare listings
Compare